Alterations to a single dwelling and all other non-domestic work | Building Control fees | Sevenoaks District Council

Building Control fees

Alterations to a single dwelling and all other non-domestic work

Fees include VAT where applicable. Regularisation applications are not subject to VAT.
 

Alterations

Limited to work not more than three storeys above ground level.

Code

Alterations

Full Plans application

Full Plans inspection

Building Notice

Regularisation

D11

Renovation of a thermal element i.e. recovering a roof or recladding walls

£260.82

£0

£260.82

£326.03

D12

Replacement of windows, roof windows or external glazed doors

£260.82

£0

£260.82

£326.03

D14

Cost of work between £2,001 & £5,000

£367.94

£0

£367.94

£459.93

D15

Cost of work between £5,001 & £15,000

£217.36

£367.94

£585.30

£731.63

D16

Cost of work between £15,001 & £25,000

£246.85

£487.49

£734.34

£917.93

D17

Cost of work between £25,001 & £50,000

£391.24

£788.68

£1,179.90

£1,474.89

D18

Cost of work between £50,001 & £100,000

£485.93

£954.79

£1,440.70

£1,800.90

D21 Cost of work between £100,001 & £200,000 £600.82 £1,134.90 £1,735.70 £2,169.62

 

Competent Persons Schemes 

Code

Alterations

Full Plans application

Full Plans inspection

Building Notice

Regularisation

D19

Where a satisfactory competent Persons certificate will not be issued, i.e. Part P, GASAFE, HETAS, OFTEC

£375

This charge relates to the first fix pre- plaster inspection and final testing on completion. For a Regularisation Certificate full testing and appraisal will be carried out.

Estimated cost of works

The estimated cost of work used to determine the charges above should be a reasonable estimate that would be charged by a professional builder to carry out such work (including VAT).
 

Competent Persons Schemes

If a certified installer is not subsequently employed or Competent Person's Certification is not received, the charge in code D19 will be required for each unit. This is to enable checks and tests on the work to be made by our nominated contractor to establish that the work meets with the requirements of the Building Regulations 2010.